MultiMedia Products, Speakers, Earphones, Headsets
Base Price ₹650.00 + ₹117.00 GST (18%)
₹767.00
Headphone EVM EnSonic EVM-WHF-01 | Wireless Blutooth Headphone With Mic, 40 Hours Playtime, Dual Connectivity, Bluetooth 5.3 + EDR, 400mAh Rechargeable Battery, Type-C Interface, Aux Cable Interface, Raised Buttons, 40mm Speaker Driver, Grey
- Brand :EVM
- Product SKU :EVM-WHF-01 (GREY)
- Category :MultiMedia Products, Speakers, Earphones, Headsets
-
Availability :
13 In Stock
Base Price ₹650.00 + ₹117.00 GST (18%)
₹767.00
₹3,999.00
(incl. GST)
- Model NameHeadphone EVM EnSonic EVM-WHF-01 | Wireless Blutooth Headphone With Mic, 40 Hours Playtime, Dual Connectivity, Bluetooth 5.3 + EDR, 400mAh Rechargeable Battery, Type-C Interface, Aux Cable Interface, Raised Buttons, 40mm Speaker Driver, Grey
- BrandEVM
- CategoryMultiMedia Products, Speakers, Earphones, Headsets
- AvailabilityIn Stock
40 Hours Playtime – Non-stop entertainment
400mAh Battery – Long-lasting and rechargeable
In-Built Mic – Clear calling experience
Type-C Charging & AUX Support – Dual convenience
Bluetooth 5.3 + EDR – Fast, stable connection
Dual Connectivity – Use Wired or Wireless
Raised Buttons – Easy fingertip control
40mm Speaker Driver – Deep, powerful sound
You may also like these
HAMMOK
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
19 In Stock
Speaker Hammok Vintage Wooden USB Speaker | Thumping Bass, Clear Vocals, Built In Amplifier, Stylish & Compact, Brown
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
₹999.00
(incl. GST)
HAMMOK
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
18 In Stock
Speaker Hammok Vintage Wooden USB Speaker | Thumping Bass, Clear Vocals, Built In Amplifier, Stylish & Compact, Black
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
₹999.00
(incl. GST)
HAMMOK
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
3 In Stock
Hammok Duet II Bluetooth Speaker | Powerful 7W Output, RGB, TF Card, TWS Pairing, USB Type-c Fast Charging, 1500 mAh Battery, Blue
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
₹2,299.01
(incl. GST)
Logitech
Base Price ₹5,500.00 + ₹990.00 GST (18%)
₹6,490.00
1 In Stock
Headphone Logitech Zone Vibe 300 | Wireless Bluetooth Over Ear Headset With Noise Cancelling Microphone, Compatible with Windows, Mac, Chrome, Linux, iOS, iPados, Android, Graphite
Base Price ₹5,500.00 + ₹990.00 GST (18%)
₹6,490.00
₹8,390.00
(incl. GST)
Zebion
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
5 In Stock
Zebion Everest Wireless Neckband | Bluetooth, 30H Playtime, 200H Standby, Stereo Sound, Inbuilt Mic, Water & Sweat Resistant, Magnetic Ends, Extra Bass, Carry Case, Black
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
₹1,999.00
(incl. GST)
HAMMOK
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
2 In Stock
Hammok Duet II Bluetooth Speaker | Powerful 7W Output, RGB, TF Card, TWS Pairing, USB Type-c Fast Charging, 1500 mAh Battery, Black
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
₹2,299.01
(incl. GST)
HAMMOK
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
3 In Stock
Hammok Duet II Bluetooth Speaker | Powerful 7W Output, RGB, TF Card, TWS Pairing, USB Type-c Fast Charging, 1500 mAh Battery, Grey
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
₹2,299.01
(incl. GST)
Logitech
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
8 In Stock






