MultiMedia Products, Speakers, Earphones, Headsets
Base Price ₹650.00 + ₹117.00 GST (18%)
₹767.00
Headphone EVM EnSonic EVM-WHF-01 | Wireless Blutooth Headphone With Mic, 40 Hours Playtime, Dual Connectivity, Bluetooth 5.3 + EDR, 400mAh Rechargeable Battery, Type-C Interface, Aux Cable Interface, Raised Buttons, 40mm Speaker Driver, Black
- Brand :EVM
- Product SKU :EVM-WHF-01(BLACK)
- Category :MultiMedia Products, Speakers, Earphones, Headsets
-
Availability :
5 In Stock
Base Price ₹650.00 + ₹117.00 GST (18%)
₹767.00
₹3,999.00
(incl. GST)
- Model NameHeadphone EVM EnSonic EVM-WHF-01 | Wireless Blutooth Headphone With Mic, 40 Hours Playtime, Dual Connectivity, Bluetooth 5.3 + EDR, 400mAh Rechargeable Battery, Type-C Interface, Aux Cable Interface, Raised Buttons, 40mm Speaker Driver, Black
- BrandEVM
- CategoryMultiMedia Products, Speakers, Earphones, Headsets
- AvailabilityIn Stock
40 Hours Playtime – Non-stop entertainment
400mAh Battery – Long-lasting and rechargeable
In-Built Mic – Clear calling experienceType-C Charging & AUX Support – Dual convenience
Bluetooth 5.3 + EDR – Fast, stable connection
Dual Connectivity – Use Wired or Wireless
Raised Buttons – Easy fingertip control
40mm Speaker Driver – Deep, powerful sound
You may also like these
EVM
Base Price ₹370.34 + ₹66.66 GST (18%)
₹437.00
6 In Stock
Speaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W × 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black
Base Price ₹370.34 + ₹66.66 GST (18%)
₹437.00
₹1,749.00
(incl. GST)
HAMMOK
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
15 In Stock
Speaker Hammok Jessi USB 2.0 Multimedia Computer Speakers | Built-in Bottom Bass Radiators, Aux Connectivity, USB Powered and Volume Control, PC Laptop Desktop Speakers (Orange+Black)
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
₹799.00
(incl. GST)
HAMMOK
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
4 In Stock
Hammok Solo II Bluetooth Speaker | Powerful 5W Sound, RGB, TF Card, USB Type-c Fast Charging, TWS Pairing, 1500 mAh Battery, Pink
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
₹1,999.00
(incl. GST)
Logitech
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
1 In Stock
Headset Logitech Stereo H111 | Stereo Headphones, Single Pin, Noise-Cancelling Mic, 3.5 mm Audio Jack, Black
Base Price ₹677.97 + ₹122.03 GST (18%)
₹800.00
₹1,236.00
(incl. GST)
Logitech
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
2 In Stock
Headset Logitech H110 Wired | Stereo Headphone | Noise Cancelling Mic | 3.5mm Dual Audio Jack | PC/Mac/Laptop, Grey
Base Price ₹720.34 + ₹129.66 GST (18%)
₹850.00
₹1,095.00
(incl. GST)
EVM
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
9 In Stock
Speaker EVM EnGroove Bluetooth Speaker EVM-BTS-202 | Bluetooth Version 5.3, 12 Hours Playtime, 5W RMS, 1200mAh Battery, FM Radio, TWS Function, Rechargeble Battery, USB Type-C Charging Input Port, Built-in Mic, Black + Blue
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
₹2,399.00
(incl. GST)
ARTIS
Base Price ₹400.00 + ₹72.00 GST (18%)
₹472.00
2 In Stock
Speaker Artis Mini Black + Blue Usb Multimedia 2.0mm With Wired Volume Control, Enhanced Low Frequency Effect
Base Price ₹400.00 + ₹72.00 GST (18%)
₹472.00
₹898.99
(incl. GST)
HAMMOK
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
3 In Stock






