Sunny Enterprises
99706 36571

WhatsApp Us 24/7

All Categories
MultiMedia Products, Speakers, Earphones, Headsets

Speaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W × 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black

  • Brand :EVM
  • Product SKU :EVM-BTS-208
  • Category :MultiMedia Products, Speakers, Earphones, Headsets
  • Availability : 15 In Stock

Base Price ₹370.34 + ₹66.66 GST (18%) ₹437.00 ₹1,749.00 (incl. GST)

  • Specification
  • Description
  • Model NameSpeaker EVM EnDesk Plus Gaming 2.0 Computer Speaker EVM-BTS-208 | 3W × 23 Power /RMS, Multi Color LED Lights, Volume Controller, Aux & USB 3.5mm Output, 110cm Cable Length, Black
  • BrandEVM
  • CategoryMultiMedia Products, Speakers, Earphones, Headsets
  • AvailabilityIn Stock

● Power supply: USB 5V 2

● Power RMS: 3W × 2 3

● Speaker: 2 inches × 2 4

● Signal to noise ratio SUR: ≥ 85dB 6

● Frequency response FR: 100Hz-20KHz 6

● Input sensitivity: 500 mV 7

● Color: Black 8>Distortion: ≤ 5% 10>Impedance Impedance: 4 Ω 11

● Interface: USB head φ 3.5 Stereo input 12

● Function: Line controlled tuning, RGB Product size: 74 * 83 * 125mm

● Cable length: 1.1m, Cable control volume

You may also like these

Fast & Reliable Delivery
100% Customer Satisfaction
Wholesale & Retail Pricing
Top IT & Electronics Brands
24/7 Support for Clients