Adapters & Charges for Smartphones, Laptops, Routers, DVRs
Base Price ₹2,415.25 + ₹434.75 GST (18%)
₹2,850.00
Hub EVM 7-in-1 Smartphone Desktop Expansion With Hub EMH-01 | USB-C Hub for Android Smartphones, SD/Micro Card Readers, HDMI 4K, USB-A 5Gbps, PD 60W Vivid Desktop
USB-C Hub for Android Smartphones, SD/Micro Card Readers
- Brand :EVM
- Product SKU :EMH-01
- Category :Adapters & Charges for Smartphones, Laptops, Routers, DVRs
-
Availability :
2 In Stock
Base Price ₹2,415.25 + ₹434.75 GST (18%)
₹2,850.00
₹4,999.00
(incl. GST)
- Model NameHub EVM 7-in-1 Smartphone Desktop Expansion With Hub EMH-01 | USB-C Hub for Android Smartphones, SD/Micro Card Readers, HDMI 4K, USB-A 5Gbps, PD 60W Vivid Desktop
- BrandEVM
- CategoryAdapters & Charges for Smartphones, Laptops, Routers, DVRs
- AvailabilityIn Stock
1) 1 X Type C male cable: Cable length 110mm
2) 1 X HDMI port: Max resolution: support up to 4K@30Hz (To project the mobile screen on the monitor screen)
3) 1 X USB 3.0 port: Maximum power output up to 5V/900mAh Data transfer speeds up to 5Gbps
4) 2 X USB 2.0 port: Maximum power output up to 5V/500mAh Data transfer speeds up to 480Mbps
5) 1 X SD card reader: Support up to 1TB
6) 1 X micro SD card reader: Support up to 1TB
7) 1 X Type C female port: PD 3.0 Passthrough charging
8) Dimensions: 103 X 77 X 28MM
9) Compatibility: Huawei Mate10 and newer, SAMSUNG S8 and newer, Macbook Pro 2016 and newer, Macbook Air 2018 and newer
You may also like these
Hoc
Base Price ₹169.49 + ₹30.51 GST (18%)
₹200.00
12 In Stock
Power Adapter Hoc 9V 2AMP
Base Price ₹169.49 + ₹30.51 GST (18%)
₹200.00
₹439.00
(incl. GST)
RANZ
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
9 In Stock
Power Adapter Ranz 6V 1AMP
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
₹599.00
(incl. GST)
EVM
Base Price ₹1,347.46 + ₹242.54 GST (18%)
₹1,590.00
6 In Stock
External CD/DVD Drive With HUB EVM EXT-CD-01 | Support Reading & Writing CD/DVD, Hubs & SD Reader, USB 3.0 & Type C, Built-in 2 in 1 Cable, Portable & Compact, For Laptop, Mac, Desktop, PC, Plug & Play, Black
Base Price ₹1,347.46 + ₹242.54 GST (18%)
₹1,590.00
₹4,999.00
(incl. GST)
ARTIS
Base Price ₹550.00 + ₹99.00 GST (18%)
₹649.00
3 In Stock
Adapter Artis AR0904 | 90 Watt Laptop Charger without Power Cord, Compatible With Lenovo Laptops, 20 V/4.5A, Pin: 7.9 x 5.5mm, (BIS Certified), Black
Base Price ₹550.00 + ₹99.00 GST (18%)
₹649.00
₹1,999.00
(incl. GST)
M.Skill
Base Price ₹127.12 + ₹22.88 GST (18%)
₹150.00
60 In Stock
Power Adapter M.Skill 9V 2AMP DC + SONY PIN | Short Circuit & Overload Protection, SMPS Adapter For Cameras, Printers, Electronics & IT Gagets, Black
Base Price ₹127.12 + ₹22.88 GST (18%)
₹150.00
₹699.00
(incl. GST)
DVM
Base Price ₹150.00 + ₹27.00 GST (18%)
₹177.00
27 In Stock
Power Adapter DVM 12V 1.5 AMP DC + SONY PIN | Over Current, Over Voltage & Short Circuit Protection, SMPS Adapter, Black
Base Price ₹150.00 + ₹27.00 GST (18%)
₹177.00
₹299.00
(incl. GST)
Zebion
Base Price ₹338.98 + ₹61.02 GST (18%)
₹400.00
2 In Stock
Adapter laptop Zebion 4017 | 30W, 19V, 1.58A, Compatible with laptops with
Base Price ₹338.98 + ₹61.02 GST (18%)
₹400.00
₹1,299.00
(incl. GST)
RANZ
Base Price ₹300.00 + ₹54.00 GST (18%)
₹354.00
33 In Stock







