Pendrives
Base Price ₹730.51 + ₹131.49 GST (18%)
₹862.00
Pendrive EVM EnStick 64GB USB 3.2 Gen 1 EVMPDA3.2/64GB Flash Drive | High Read Speeds Upto 200MB/s & Write Speeds Upto 120MB/s, Universal Compatibility, White + Green
Pendrive EVM EnStick 64GB USB 3.2 Gen 1 EVMPDA3.2/64GB Flash Drive | High Read Speeds Upto 200MB/s & Write Speeds Upto 120MB/s, Universal Compatibility, White + Green
- Brand :EVM
- Product SKU :EVMPDA3.2/64GB
- Category :Pendrives
-
Availability :
11 In Stock
Base Price ₹730.51 + ₹131.49 GST (18%)
₹862.00
₹2,199.00
(incl. GST)
- Model NamePendrive EVM EnStick 64GB USB 3.2 Gen 1 EVMPDA3.2/64GB Flash Drive | High Read Speeds Upto 200MB/s & Write Speeds Upto 120MB/s, Universal Compatibility, White + Green
- BrandEVM
- CategoryPendrives
- AvailabilityIn Stock
(1) Capacity : 64GB(2) Performance Read (Max.): up to 200MB/s(3) Performance Write (Max.): up to 120MB/s(4) Interface: USB 3.2 Gen 1(5) Compatibility: USB 3.2 Gen 1(6) Operating Temperature: 0oC to 65oC(7) Storage Temperature: -40oC to 85oC(8) Major IC Chipsets(9) Universal Compatibility
You may also like these
SanDisk
8 In Stock
Pendrive SanDisk Ultra Dual Drive Luxe Type-C 64GB SDDDC4-064G-I35GD Flash Drive | USB 3.2 Gen 1, OTG, Upto 400MB/S Read Speed, Gold
Base Price ₹1,355.93 + ₹244.07 GST (18%) ₹1,600.00 (incl. GST)
SanDisk
Base Price ₹550.85 + ₹99.15 GST (18%)
₹650.00
16 In Stock
Pendrive SanDisk 32GB Ultra Fit USB 3.1 Flash Drive - 130MB/s, Compact | SDCZ430-032G-I35
Base Price ₹550.85 + ₹99.15 GST (18%)
₹650.00
₹700.00
(incl. GST)
SanDisk
Base Price ₹381.36 + ₹68.64 GST (18%)
₹450.00
11 In Stock
Pendrive Sandisk 16gb Dual Drive SDDD3-016G-I35 3.0
Base Price ₹381.36 + ₹68.64 GST (18%)
₹450.00
₹675.00
(incl. GST)
SanDisk
Base Price ₹5,500.00 + ₹990.00 GST (18%)
₹6,490.00
1 In Stock
Pendrive SanDisk iXpand 256GB SDIX70N-256G-GN6NE | USB 3.0 Flash Drive Luxe for iPhone, iPad Pro, MAC Devices, Type-C Android Phone & Other Devices
Base Price ₹5,500.00 + ₹990.00 GST (18%)
₹6,490.00
₹14,999.99
(incl. GST)
EVM
Base Price ₹1,652.54 + ₹297.46 GST (18%)
₹1,950.00
21 In Stock
Pendrive EVM EnXO 128GB USB 3.2 Gen 1 Type C OTG Flash Drive ENXO/128G | High Speed Upto 120MB/s Read & 50MB/s Write Speed, Universal Compatibility, Black
Base Price ₹1,652.54 + ₹297.46 GST (18%)
₹1,950.00
₹2,999.01
(incl. GST)
SanDisk
Base Price ₹2,101.69 + ₹378.30 GST (18%)
₹2,479.99
4 In Stock
Pendrive SanDisk 256GB Ultra Flair USB 3.0 Flash Drive - 150MB/s, Metal Casing | SDCZ73-256G-I35
Base Price ₹2,101.69 + ₹378.30 GST (18%)
₹2,479.99
₹3,000.00
(incl. GST)
SanDisk
Base Price ₹2,000.00 + ₹360.00 GST (18%)
₹2,360.00
1 In Stock
Pendrive Sandisk Ultra Shift 256GB USB 3.2 Gen 1 SDCZ410-256G- I35BB Flash Drive | 100MB/s Read Speed, Compact Design, Bachelor Button
Base Price ₹2,000.00 + ₹360.00 GST (18%)
₹2,360.00
₹2,800.00
(incl. GST)
EVM
Base Price ₹550.85 + ₹99.15 GST (18%)
₹650.00
65 In Stock




