Monitors, Display Screen
Base Price ₹4,150.00 + ₹747.00 GST (18%)
₹4,897.00
Monitor EVM C160 PLASMA LED | 21.5 Inch Curve LED Frameless FHD Monitor With Speaker, Digital Crystal Clear, VGA, HDMI, DC Port, 100Hz Perfect Motion Rate, A+ Grade, 16.7 M Color, Low Blue Light, Flicker Free, AntiGlare, Wall Mountable, White
Monitor EVM C160 PLASMA LED | 21.5 Inch Curve LED Frameless FHD Monitor With Speaker
- Brand :EVM
- Product SKU :EVM C160 PLASMA LED
- Category :Monitors, Display Screen
-
Availability :
Stock Out
Base Price ₹4,150.00 + ₹747.00 GST (18%)
₹4,897.00
₹17,499.00
- Model NameMonitor EVM C160 PLASMA LED | 21.5 Inch Curve LED Frameless FHD Monitor With Speaker, Digital Crystal Clear, VGA, HDMI, DC Port, 100Hz Perfect Motion Rate, A+ Grade, 16.7 M Color, Low Blue Light, Flicker Free, AntiGlare, Wall Mountable, White
- BrandEVM
- CategoryMonitors, Display Screen
- AvailabilityOut of Stock
Specifications :
● Panel Size 21.5" 55cm Curve LED
● Panel Type : Flat Curve LED
● Resolution : 1920×1080 Full HD
● Max Brightness : 200-250cd/m2
● Max Contrast Ratio : 1000:1 Type
● Display Colour : 16.9M
● Viewing Angle : H:178 V:178
● Tilt Range : Front 5/ rear15
● Response time : 5-8MS
● Port : VGA+HDMI+ DC+Speaker
● Wall mount Support
● Control Button : Menu,-,+,AUTO, Power
● Consumption : <24W Standby <1W
● Power :DC: 12V 2A
● Other function : Low blue light Freesync Flicker-Free
● Scan frequency 100Hz
● A+ Grade
● Anti glare
● Speaker 8Ω 2W*2
You may also like these
DELL
Base Price ₹7,300.00 + ₹1,314.00 GST (18%)
₹8,614.00
5 In Stock
Monitor Dell E2425HM | 23.8″ FHD IPS monitor with 100Hz refresh rate and 5ms response. 250 nits brightness, 1000:1 contrast, tilt adjustment, HDMI/DP/VGA ports, VESA mount (100×100), and 3-star eye comfort in black.
Base Price ₹7,300.00 + ₹1,314.00 GST (18%)
₹8,614.00
₹21,805.00
(incl. GST)
BENQ
Base Price ₹33,898.31 + ₹6,101.70 GST (18%)
₹40,000.01
1 In Stock
Monitor BenQ 32 Inch EW3290U | 4K UHD HDR 3840 x 2160 Work & Entertainment Display Monitor With 98% P3, Remote Control, AI Contrast, USB-C (65W PD), 3 x HDMI Ports, USB Hub, Ergonomic, Eye-Care, White
Base Price ₹33,898.31 + ₹6,101.70 GST (18%)
₹40,000.01
₹54,989.99
(incl. GST)
DELL
Base Price ₹12,000.00 + ₹2,160.00 GST (18%)
₹14,160.00
1 In Stock
Monitor Dell S2725HSM | 27"/68.58cm FHD, 144Hz Refresh Rate, IPS Panel, 1ms Response, Flicker-free, 2xHDMI, Built-in 6W Dual Speakers, 4-Star Eye Comfort | White
Base Price ₹12,000.00 + ₹2,160.00 GST (18%)
₹14,160.00
₹21,898.99
(incl. GST)
Acer
Base Price ₹4,500.00 + ₹810.00 GST (18%)
₹5,310.00
24 In Stock
Monitor Acer K202QMBI 19.5-inch Monitor (UM.IE0SI.001) | HD+ 1600x900 LCD with LED backlight, 200 nits brightness, 6ms response time, 75Hz refresh rate, VGA & HDMI ports, HDMI cable included, eye care features, tilt & wall mount support, black.
Base Price ₹4,500.00 + ₹810.00 GST (18%)
₹5,310.00
₹8,000.00
(incl. GST)
DELL
Base Price ₹10,500.00 + ₹1,890.00 GST (18%)
₹12,390.00
2 In Stock
Monitor Dell SE2726D | 27 inch (68.58 cm) QHD IPS Display, 144Hz Refresh, AMD FreeSync, Eye Comfort Technology, Flicker-Free, HDMI/DP Connectivity, Elegant Design for Work & Play | Black
Base Price ₹10,500.00 + ₹1,890.00 GST (18%)
₹12,390.00
₹18,339.01
(incl. GST)
EVM
Base Price ₹1,694.92 + ₹305.09 GST (18%)
₹2,000.01
26 In Stock
Monitor EVM 175 GRAND SQ LED | 17.1 Inch 1280×1024 60HZ, True Pixel, 5ms Fast Response Time, 16.7M Display Colors, VGA+HDMI, Viewing Angle H:176º,V:160º, Max Brightness 160-200cd/m2, Panel Size 336 (H) × 265 (V)MM, 100x100mm VESA Wall Mountable, Black
Base Price ₹1,694.92 + ₹305.09 GST (18%)
₹2,000.01
₹4,499.00
(incl. GST)
BENQ
Base Price ₹15,084.75 + ₹2,715.26 GST (18%)
₹17,800.01
1 In Stock
Monitor BenQ GW2785TC | 27 inch (68.58cm) IPS Full HD 75Hz Ultra-Slim Bezel Monitor with Height Adjustment, Eye Care, Brightness Intelligence, USB-C (PD 60W), HDMI, DP, Coding Mode, Daisy Chain, Built-in Speaker
Base Price ₹15,084.75 + ₹2,715.26 GST (18%)
₹17,800.01
₹31,990.00
(incl. GST)
Acer
Base Price ₹5,000.00 + ₹900.00 GST (18%)
₹5,900.00
6 In Stock



