Keyboard, Mouse, Combos (Wired, Wireless & Bluetooth)
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
Keyboard EVM EnAir WLK-009 Rechargeable Wireless Keyboard With Touchpad | Bluetooth 5.0 With Type C Interface, 10 Million Clicks, Smooth Keystrokes, Support Windows, MacOS, Android, Linux, Chrome OS, Slim & Lightweight, Black
Keyboard EVM EnAir WLK-009 Rechargeable Wireless Keyboard With Touchpad
- Brand :EVM
- Product SKU :ENAIR WLK-009 (BLACK)
- Category :Keyboard, Mouse, Combos (Wired, Wireless & Bluetooth)
-
Availability :
1 In Stock
Base Price ₹635.59 + ₹114.41 GST (18%)
₹750.00
₹2,999.01
(incl. GST)
- Model NameKeyboard EVM EnAir WLK-009 Rechargeable Wireless Keyboard With Touchpad | Bluetooth 5.0 With Type C Interface, 10 Million Clicks, Smooth Keystrokes, Support Windows, MacOS, Android, Linux, Chrome OS, Slim & Lightweight, Black
- BrandEVM
- CategoryKeyboard, Mouse, Combos (Wired, Wireless & Bluetooth)
- AvailabilityIn Stock
● Bluetooth Version 5.0
● Type-C Interface
● Power Source: 180mAh Lithium re-chargeable Battery
● No. of keys: 78 Key
● Switch Life: 10 million keystrokes
● System Requirements:>OS Support: Windows I macOS I Android I Linux I Chrome OS
● Battery Life: Up to 30 days
● Charging Time : 2 hours approx.
● Effective Range : Up to 10 meters
You may also like these
Zebion
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
105 In Stock
Mouse Zebion Rocky USB with Latest Optical Technology, 800 DPI Resolution, Ergonomic Design, Smooth Low-Friction Movements and Comfy Palm Fit
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
₹249.99
(incl. GST)
Logitech
Base Price ₹1,144.07 + ₹205.93 GST (18%)
₹1,350.00
42 In Stock
Keyboard + Mouse Combo Logitech MK220 | Compact Wireless for Windows, 2.4 GHz Wireless with Unifying USB-Receiver, 24 Month Battery, Compatible with PC | Black
Base Price ₹1,144.07 + ₹205.93 GST (18%)
₹1,350.00
₹1,995.00
(incl. GST)
Logitech
Base Price ₹2,203.39 + ₹396.61 GST (18%)
₹2,600.00
1 In Stock
Keyboard Logitech Wireless K380 | Multi-Device Bluetooth Keyboard for Windows, Apple iOS, Apple TV, Android or Chrome, for PC / Mac / Laptop / Smartphone / Tablet (Off White)
Base Price ₹2,203.39 + ₹396.61 GST (18%)
₹2,600.00
₹3,195.00
(incl. GST)
Logitech
Base Price ₹3,598.31 + ₹647.70 GST (18%)
₹4,246.01
1 In Stock
Keyboard + Mouse Combo Logitech MK470 Slim Wireless - Graphite
Base Price ₹3,598.31 + ₹647.70 GST (18%)
₹4,246.01
₹4,995.00
(incl. GST)
EVM
Base Price ₹508.47 + ₹91.52 GST (18%)
₹599.99
6 In Stock
Keyboard & Mouse Combo EVM Wireless Enkey WLKM & 3W042 | 104 Function Keys, 2.4Ghz Wireless Keyboard & 3D Wireless Mouse, USB, Plug & Play, Black + Blue
Base Price ₹508.47 + ₹91.52 GST (18%)
₹599.99
₹1,399.00
(incl. GST)
Logitech
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
104 In Stock
Mouse Logitech M90 Wired USB Mouse | 1000 DPI Optical Tracking, Ambidextrous PC / Mac / Laptop | Black
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
₹530.00
(incl. GST)
Logitech
Base Price ₹1,398.31 + ₹251.70 GST (18%)
₹1,650.01
11 In Stock
Keyboard Logitech Wireless Combo MK-240 | Nano Wireless USB Keyboard and Mouse Set, 12 Function Keys 2.4GHz Wireless, 1000DPI, Spill-Resistant Design, PC/Mac, Black/Chartreuse Yellow
Base Price ₹1,398.31 + ₹251.70 GST (18%)
₹1,650.01
₹2,095.00
(incl. GST)
Zebion
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
31 In Stock



