External Harddisk
Base Price ₹20,338.98 + ₹3,661.02 GST (18%)
₹24,000.00
Harddisk EVM Elite EnSave Pro 2TB External SSD EPSSDPro/2T | Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface, Multiple Device compatibility, Black
Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface
- Brand :EVM
- Product SKU :EPSSDPRO/2T
- Category :External Harddisk
-
Availability :
3 In Stock
Base Price ₹20,338.98 + ₹3,661.02 GST (18%)
₹24,000.00
₹25,999.00
(incl. GST)
- Model NameHarddisk EVM Elite EnSave Pro 2TB External SSD EPSSDPro/2T | Smallest Portable SSD With 2000 Mb/s Read & 1700 Write Speed, USB 3.2 Gen 2x2 Type-C Interface, Multiple Device compatibility, Black
- BrandEVM
- CategoryExternal Harddisk
- AvailabilityIn Stock
• Aluminium Alloy Body for Faster Heat Dissipation.• Extremely Compact Profile: 65 x 31 x 5.7 mm• High Read & Write speeds: R Upto 2000 MB/s, W Upto 1700 MB/s (based onhost drive support USB-C 3.2 Gen2x2) Seller reserves the right of interpretation.• USB 3.2 Gen 2x2 Type-C Interface.• Multiple Device compatibility.• C to C & C to USB-A adaptor Included.
You may also like these
Seagate
Base Price ₹15,500.00 + ₹2,790.00 GST (18%)
₹18,290.00
2 In Stock
Harddisk Seagate One Touch 4TB External HDD with Password Protection, Space Gray, for Windows and Mac, with 3 yr Data Recovery Services, and 4 Months Adobe CC Photography (STKZ4000404)
Base Price ₹15,500.00 + ₹2,790.00 GST (18%)
₹18,290.00
₹31,999.00
(incl. GST)
Seagate
Base Price ₹8,305.08 + ₹1,494.91 GST (18%)
₹9,799.99
3 In Stock
Hard Disk Drive Harddisk Seagate One Touch 1TB External HDD with Password Protection – Black, for Windows and Mac, with 3 yr Data Recovery Services, and 4 Months Adobe CC Photography (STKY1000400)
Base Price ₹8,305.08 + ₹1,494.91 GST (18%)
₹9,799.99
₹17,999.00
(incl. GST)
EVM
Base Price ₹7,050.00 + ₹1,269.00 GST (18%)
₹8,319.00
2 In Stock
Harddisk EVM EnSave 512GB External SSD EPSSD/512G | Smallest Portable SSD With 550 Mb/s Read & 500 Mb/s Write Speed, USB 3.1 Gen 2 Type C, Compatible With All PCs & Laptops With USB Port, Black
Base Price ₹7,050.00 + ₹1,269.00 GST (18%)
₹8,319.00
₹14,999.00
(incl. GST)
EVM
Base Price ₹4,400.00 + ₹792.00 GST (18%)
₹5,192.00
4 In Stock
Harddisk EVM EnSave External SSD 256GB EPSSD/256GB | Smallest Portable SSD, 550 MB/s Read & 500 MB/s Write Speed, M.2 USB 3.1 Gen 2 Type C Interface, Compatible With All PCs & Laptops with USB Port, Black
Base Price ₹4,400.00 + ₹792.00 GST (18%)
₹5,192.00
₹8,999.00
(incl. GST)
Seagate
Base Price ₹18,150.00 + ₹3,267.00 GST (18%)
₹21,417.00
1 In Stock
Harddisk Seagate One Touch 5TB STKZ5000402 | External HDD With Password Protection, For Windows & Mac, With 3 Yr Data Recovery Services, Light Blue
Base Price ₹18,150.00 + ₹3,267.00 GST (18%)
₹21,417.00
₹36,998.99
(incl. GST)
Seagate
Base Price ₹17,500.00 + ₹3,150.00 GST (18%)
₹20,650.00
2 In Stock
Harddisk Seagate Expansion 5TB External, USB 3.0 for Windows & Mac with 3yr Data Recovery Services STKM5000400
Base Price ₹17,500.00 + ₹3,150.00 GST (18%)
₹20,650.00
₹35,999.00
(incl. GST)
SanDisk
1 In Stock
Harddisk SanDisk 4TB SDSSDE61-4T00-IN25 | Extreme Portable SSD 1050MB/s R, 1000MB/s W, Upto 3 Meter Drop Protection with IP65 Water/dust Resistance, HW Encryption, PC, MAC & TypeC Smartphone Compatible, Black
Base Price ₹40,508.47 + ₹7,291.52 GST (18%) ₹47,799.99 (incl. GST)
Seagate
Base Price ₹13,000.00 + ₹2,340.00 GST (18%)
₹15,340.00
10 In Stock




