Convertors, Extenders, Splitters etc
Base Price βΉ190.68 + βΉ34.32 GST (18%)
βΉ225.00
Converter EVM Mini DP To VGA EVM-MDPVGA | Compact Design, Superior Stability, Broad Compatibility, Plug & Play, Black
Compact Design, Superior Stability
- Brand :EVM
- Product SKU :EVM-MDPVGA
- Category :Convertors, Extenders, Splitters etc
-
Availability :
5 In Stock
Base Price βΉ190.68 + βΉ34.32 GST (18%)
βΉ225.00
βΉ799.00
(incl. GST)
- Model NameConverter EVM Mini DP To VGA EVM-MDPVGA | Compact Design, Superior Stability, Broad Compatibility, Plug & Play, Black
- BrandEVM
- CategoryConvertors, Extenders, Splitters etc
- AvailabilityIn Stock
- Superior Stability Enjoy consistent and reliable performance without signal dropouts.
- Plug and Play No software installation required just plug it in and go.
- Broad Compatibility Works with MacBooks, iMacs, HDTVs, projectors, Etc.
- Compact & Portable Lightweight design for easy transport and use on the go.
- Clear 1080p HD Output Supports 1080p resolution at 60Hz for sharp vibrant visuals.
You may also like these
Secureye
Base Price βΉ6,000.00 + βΉ1,080.00 GST (18%)
βΉ7,080.00
7 In Stock
Extender Hdmi Secureye 120mtr SC-S-HDKEC-120M | With KVM support, HDMI 1.3, HDCP 1.2, 1080@60Hz Full HD, Support 3D, 120M Distance, Keyboard & Mouse, Smoothing & Real time, Plug & Play
Base Price βΉ6,000.00 + βΉ1,080.00 GST (18%)
βΉ7,080.00
βΉ8,500.00
(incl. GST)
DIER
Base Price βΉ500.00 + βΉ90.00 GST (18%)
βΉ590.00
2 In Stock
HDMI Accessory Splitter HDMI Dier BOGOTA 2 Port | HDMI Splitter 1 in 2 Out, Supports 3D 4K x 2K, 30HZ Full HD 1080P, Plug & Play, Adapter Included, Black
Base Price βΉ500.00 + βΉ90.00 GST (18%)
βΉ590.00
βΉ1,099.00
(incl. GST)
EVM
Base Price βΉ313.56 + βΉ56.44 GST (18%)
βΉ370.00
51 In Stock
Converter EVM VGA To HDMI EVM-VGAHD | 1080P VGA Male to HDMI Female Adapter With 3.5mm Audio Jack
Base Price βΉ313.56 + βΉ56.44 GST (18%)
βΉ370.00
βΉ898.99
(incl. GST)
DIER
Base Price βΉ500.00 + βΉ90.00 GST (18%)
βΉ590.00
11 In Stock
Cable Convertor Adapter Dier ALICE USB 3.0 To GIGA LAN | 10/100/1000 Mbps Speed Gigabit Ethernet RJ45 Network Cable, Grey
Base Price βΉ500.00 + βΉ90.00 GST (18%)
βΉ590.00
βΉ1,999.00
(incl. GST)
Secure Eye
Base Price βΉ4,406.78 + βΉ793.22 GST (18%)
βΉ5,200.00
1 In Stock
Extender Secureye SC-S-HDKEC-50M HDMI | Supports HDMI 1.3, HDCP 1.2, Full HD 1080p@60Hz, 3D, KVM keyboard & mouse control, 50m transmission distance, real-time smooth performance, plug & play
Base Price βΉ4,406.78 + βΉ793.22 GST (18%)
βΉ5,200.00
βΉ7,000.00
(incl. GST)
DIER
Base Price βΉ950.00 + βΉ171.00 GST (18%)
βΉ1,121.00
10 In Stock
Extender HDMI Dier ESTOCOLMO 60Mtr | HDTV Over Ethernet, Repeater Transmitter / Sender + Receiver Over Cat5 / Cat6 Up to 60mtr, Supports 3D & Full HD1080p, For TV, Projector, HDTV, DVR, PC, DVD, With Adaptor, Black
Base Price βΉ950.00 + βΉ171.00 GST (18%)
βΉ1,121.00
βΉ2,099.00
(incl. GST)
DIER
Base Price βΉ5,100.00 + βΉ918.00 GST (18%)
βΉ6,018.00
1 In Stock
Cable KVM Extender HDMI Dier PALERMO 200Mtr | 4K 8K Ultra HD 3D, IR Control Support USB Mouse & Keyboard Extension Over cat5e cat6 Cable, Video Resolution Upto 1080p, With Adaptor
Base Price βΉ5,100.00 + βΉ918.00 GST (18%)
βΉ6,018.00
βΉ14,399.00
(incl. GST)
DIER
Base Price βΉ550.00 + βΉ99.00 GST (18%)
βΉ649.00
20 In Stock


