Cords, Charging cables, hdmi, Vga, usb cables etc
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
Charger EVM Enpower EVM-PD-011 | 22.5W PD Charger, White
EnPower PD Charger
- Brand :EVM
- Product SKU :EVM-PD-011
- Category :Cords, Charging cables, hdmi, Vga, usb cables etc
-
Availability :
Stock Out
Base Price ₹296.61 + ₹53.39 GST (18%)
₹350.00
₹1,699.00
(incl. GST)
- Model NameCharger EVM Enpower EVM-PD-011 | 22.5W PD Charger, White
- BrandEVM
- CategoryCords, Charging cables, hdmi, Vga, usb cables etc
- AvailabilityOut of Stock
(1) Input : AC100-240V~50/60 Hz 0.5A
(2) PD Output : DC 5V 3A, 9V 2.5A, 12V 1.87A
(3) Charging Port: Single Type-C
(4) Over Current Protection
(5) Short Circuit Protection
(6) Surge Protection
(7) No load Protection
You may also like these
RANZ
Base Price ₹338.98 + ₹61.02 GST (18%)
₹400.00
4 In Stock
Cable Ranz VGA Male To Male 10mtr | High Durability, Long Lasting, Plug & Play, White
Base Price ₹338.98 + ₹61.02 GST (18%)
₹400.00
₹889.00
(incl. GST)
RANZ
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
36 In Stock
Cable Ranz Usb to Micro 1mtr
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
₹118.00
(incl. GST)
Haze
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
14 In Stock
Cable Serial 9pin male to female 1.5Mtr | Extension Cable, Can be used for PC-PC File transfer, Compatible with Laptop, Scanner, Monitor, Modem, Printer
Base Price ₹84.75 + ₹15.25 GST (18%)
₹100.00
₹210.00
(incl. GST)
HAMMOK
Base Price ₹500.00 + ₹90.00 GST (18%)
₹590.00
5 In Stock
Cable Hammok Knox DP To DP 3mtr | 8K, Universal Compatibility, Gaming & Professional Monitor Cable, Black
Base Price ₹500.00 + ₹90.00 GST (18%)
₹590.00
₹1,499.00
(incl. GST)
DIER
Base Price ₹200.00 + ₹36.00 GST (18%)
₹236.00
87 In Stock
Cable Dier Berlin USB 2.0 5mtr, Gold Plated Connectors, High Speed Printer Cable A to B Type, Fully Compatible with all USB B Port Scanner or Printer, 1 Year Warranty, Black
Base Price ₹200.00 + ₹36.00 GST (18%)
₹236.00
₹799.00
(incl. GST)
RANZ
Base Price ₹1,610.17 + ₹289.83 GST (18%)
₹1,900.00
1 In Stock
Cable Ranz VGA M-M 40mtr
Base Price ₹1,610.17 + ₹289.83 GST (18%)
₹1,900.00
₹3,304.00
(incl. GST)
RANZ
Base Price ₹42.37 + ₹7.63 GST (18%)
₹50.00
4 In Stock
Cable Ranz 1.5 Meters 3.5mm Stereo Audio Male to RCA Male - Works with VCR, DVD, HD-TV, any other audio video equipment with 2RCA connectors
Base Price ₹42.37 + ₹7.63 GST (18%)
₹50.00
₹210.00
(incl. GST)
DIER
Base Price ₹150.00 + ₹27.00 GST (18%)
₹177.00
14 In Stock




