Usb Add-on Products
Base Price ₹889.83 + ₹160.17 GST (18%)
₹1,050.00
Casing EVM M.2 SATA & NVMe Enclosure EVM-CG-003 | USB 3.1 Gen2 Type C, 10Gbps Data Transfer, Transparent
- Brand :EVM
- Product SKU :EVM-CG-003
- Category :Usb Add-on Products
-
Availability :
8 In Stock
Base Price ₹889.83 + ₹160.17 GST (18%)
₹1,050.00
₹2,594.82
- Model NameCasing EVM M.2 SATA & NVMe Enclosure EVM-CG-003 | USB 3.1 Gen2 Type C, 10Gbps Data Transfer, Transparent
- BrandEVM
- CategoryUsb Add-on Products
- AvailabilityIn Stock
Item : Type-C 3.1 M.2 SSD Enclosure
● Color : Transparent
● Outer Port : Type-C 3.1 Gen2 Port 10Gbps
● Maximum support: 4TB Capacity
● Power Supply: USB Port Power Supply Directly
● Support SSD size: 2230/2242/2260/2280
● With Heat Sink to Guarantee Super Cooling Performance
You may also like these
RANZ
Base Price ₹254.24 + ₹45.76 GST (18%)
₹300.00
10 In Stock
Card Reader + 3 Port USB 2.0 Hub (Combo) Ranz | Ultra Fast Speed for Pendrives / Cameras / Mobiles / PC / Laptop / Notebook / Tablet, Docking station, MS/MS pro Duo / SD / MMC / M2 / Micro SD support
Base Price ₹254.24 + ₹45.76 GST (18%)
₹300.00
₹499.00
(incl. GST)
RANZ
Base Price ₹254.24 + ₹45.76 GST (18%)
₹300.00
27 In Stock
Casing Ranz SATA External 2.5" M-2521 | Portable Hard Disk Cover Case Enclosure USB 2.0, For Laptop Hard Disk
Base Price ₹254.24 + ₹45.76 GST (18%)
₹300.00
₹449.00
(incl. GST)
HAMMOK
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
17 In Stock
Casing Hammok CLEO USB-C 3.1 RGB Sata HDD Enclosure | Robust Protection, Compact & Portable, Plug & Play, Black
Base Price ₹450.00 + ₹81.00 GST (18%)
₹531.00
₹1,598.99
(incl. GST)
LiveTech
Base Price ₹338.98 + ₹61.02 GST (18%)
₹400.00
3 In Stock
Card Live Tech Pci Firewire Card
Base Price ₹338.98 + ₹61.02 GST (18%)
₹400.00
₹499.00
(incl. GST)
TP-Link
Base Price ₹3,177.97 + ₹572.03 GST (18%)
₹3,750.00
3 In Stock
Hub TP-Link UH9120C | USB Type-C 9 in 1 Hub, Multiport USB-C Adapter Dongle Docking Station, 4K 60Hz HDMI, 1Gbps Ethernet, SD & MicroSD UHS-I, 3× USB-A Data Ports, 100W Fast Charging, 5 Gbps Data Transfer, Durable Design, Braided Cable, Plug & Play, Grey
Base Price ₹3,177.97 + ₹572.03 GST (18%)
₹3,750.00
₹7,999.00
(incl. GST)
RANZ
Base Price ₹169.49 + ₹30.51 GST (18%)
₹200.00
20 In Stock
Converter Ranz Mini DP to HDMI Adapter
Base Price ₹169.49 + ₹30.51 GST (18%)
₹200.00
₹999.00
(incl. GST)
Belkin
Base Price ₹6,440.68 + ₹1,159.32 GST (18%)
₹7,600.00
1 In Stock
Hub Belkin USB C Type | 11-in-1 MultiPort Adapter Dock with 4K HDMI, DP, VGA, USB-C 100W PD Pass-Through Charging, 3 USB A, Gigabit Ethernet, SD, MicroSD, 3.5mm Ports for MacBook Pro, Air, XPS and More
Base Price ₹6,440.68 + ₹1,159.32 GST (18%)
₹7,600.00
₹12,999.00
(incl. GST)
HAMMOK
Base Price ₹350.00 + ₹63.00 GST (18%)
₹413.00
60 In Stock



